Flyefit

In 2011 we started turn key fit out works for Flyefit working with Architect Michael Hussey of O’Mahony & Pike and engineers DBFL

9.jpg

1200m2

Flyefit Ranelagh

Demolished the old Night Owls club and made it into a 1200m2 fully air conditioned gym.

1450m2

Flyefit Baggot Street

At 1450m2 including a 200m2 extension, this was a challenging project, the building was made up of 3 floors with a live Tesco’s on the ground floor, the building was structurally unsuitable for a GYM but with the help of a great engineer we were able to upgrade and fit out the entire building with no disruption to Tesco.

3.jpg
5.jpg

1950m2

Flyefit Macken

A 1950m2 Gym, a big ware house from the 1920s, we
removed the existing concrete floor slab and put in a
new power floated floor throughout including fitout.

2400m2

Flyefit Swords

A 2400m2 fitout across 3 floors of relatively new building, and included some structural works and complete fitout.

2.jpg
1.jpg

1900m2

Flyefit Georges Street

1900m2, another challenging project, the building was made up of 5 buildings including two churches and a 260m2 extension.

1900m2

Flyefit Portobello

1900m2. This building was the old Garda Social Club
made up of three buildings, on this project we worked
closely with Conservation Architect Rosanne Walker
repairing all cornice, lime ceilings, centrepieces and
all original features of the building.

14.jpg
8.jpg

1600m2

Flyefit Coolock

1600m2 a large fitout including a large Mezzanine floor

1500m2

Flyefit Dundrum

1500m2, we built two large 250m2 extensions on this building and fitted out to a turnkey environment